亚洲中文字幕在线观看_国产熟女一区二区三区四区五区 _一本大道久久东京热无码AV_国产乡下三级全黄三级_国产精品_国产精品_K频道_国产成人调教在线视频_亚洲欧洲日韩综合久久_国产免费久久精品99RE丫丫一

  • 三坐標(biāo)測(cè)量機(jī)安裝調(diào)試/質(zhì)保/搬遷校驗(yàn)
三坐標(biāo)測(cè)量機(jī)安裝調(diào)試/質(zhì)保/搬遷校驗(yàn)

三坐標(biāo)測(cè)量機(jī)安裝調(diào)試/質(zhì)保/搬遷校驗(yàn)

安裝調(diào)試 Installation and Debugging
1.測(cè)量機(jī)所需的氣源、電源、溫度環(huán)境甲方根據(jù)乙方要求自行解決,費(fèi)用甲方承擔(dān)。
The supply of gas, electricity and temperature condition required by the CMM shall be settled by Party A in accordance of Party B’s requirements. Party A should pay for this.
2.乙方在合同生效時(shí)提供地基等設(shè)施條件文件,甲方根據(jù)乙方提供的地基、接地裝置圖紙,在發(fā)貨前完成基礎(chǔ)工程和機(jī)房配套電氣設(shè)施。甲方收到貨并具備安裝條件后,提前7天通知乙方安排技術(shù)人員前往安裝調(diào)試。乙方負(fù)責(zé)測(cè)量機(jī)就位和安裝技術(shù)指導(dǎo),進(jìn)行測(cè)量機(jī)聯(lián)機(jī)和精度調(diào)試。為使安裝調(diào)試工作順利進(jìn)行, 甲方應(yīng)在人員,時(shí)間和吊裝運(yùn)輸設(shè)備方面給予合作,直至測(cè)量機(jī)驗(yàn)收交付。

Party B shall provide documents of facilities such as the found-base. Party A shall finish the foundation project and the electricity and gas facilities in machine room according to the found base and earthing drawings provided by Party B. After Party A receives the machine and has the condition of installation, it shall inform Party B 7 days in advance to send technicians to install and adjust the machines. Party B takes charge in the presence of the measurement machine, the technical guidance of installation, the connection of the machines and the precision debug. In order to carry out the work smoothly, Party A shall cooperate in terms of staff, time and hoisting transporters.

質(zhì)保服務(wù) Services
測(cè)量機(jī)自驗(yàn)收之日起在正常使用情況下保修12個(gè)月,此期間由用戶(hù)人為責(zé)任造成的硬件損壞進(jìn)行維修時(shí)按成本收費(fèi);保修期滿(mǎn)后負(fù)責(zé)長(zhǎng)期有償服務(wù)。進(jìn)口件損壞由供貨方與外商聯(lián)系修理。

12 months guarantee free of charge after final acceptance, under regular service conditions. During this period, hardware damage caused by user’s personal mistake will be repaired only charging basis cost price. After that period, a long lasting pay service will be given. Supplier will connect with foreign merchant to solve the problem of import parts damage.
1. 用戶(hù)在測(cè)量機(jī)發(fā)生故障時(shí)應(yīng)及時(shí)詳細(xì)告知故障情況。供貨方接到通知后2小時(shí)做出反應(yīng)。供貨方有責(zé)任應(yīng)用戶(hù)要求在24小時(shí)內(nèi)趕到用戶(hù)現(xiàn)場(chǎng)負(fù)責(zé)處理。
When a fault happens to the CMM, a detailed fault condition should be provided by the user. Supplier will make reaction in 4 hours after receiving the trouble notice. Supplier has the duty of arriving to provide service at the user’s site in 24 hours.
2. 客戶(hù)回訪(fǎng)制度:在測(cè)量機(jī)投入使用后,公司工程師將不定期回訪(fǎng),以提供更多技術(shù)支持指導(dǎo),使用戶(hù)操作更加熟練,并正確對(duì)測(cè)量機(jī)做日常維護(hù),延長(zhǎng)測(cè)量機(jī)使用壽命
Customer care system: after the measuring machine is put into use, the company engineer will not visit regularly to provide more technical support guidance, use the user's operation more skillfully, and make the daily maintenance of the measuring machine and prolong the service life of the measuring machine.
3. 在線(xiàn)遠(yuǎn)程支持制度:公司建立在線(xiàn)遠(yuǎn)程支持制度,可對(duì)客戶(hù)終生免費(fèi)提供技術(shù)支持,編程指導(dǎo),使客戶(hù)獲得更便捷服務(wù)
Online remote support system: the company establishes an online remote support system, which provides free technical support to customers for life, programming guidance, and enables customers to get more convenient services.
4. 供貨方將以?xún)?yōu)惠價(jià)格向用戶(hù)提供其它選加附件。
Supplier will provide user with other accessory options in a preferential price.


校驗(yàn)服務(wù):
測(cè)量機(jī)運(yùn)到后,由供貨方出具發(fā)貨清單,與用戶(hù)共同驗(yàn)貨;安裝調(diào)試后,按三坐標(biāo)驗(yàn)收方法進(jìn)行驗(yàn)收,驗(yàn)收合格后,共同簽署驗(yàn)收?qǐng)?bào)告。驗(yàn)收可請(qǐng)權(quán)威第三方驗(yàn)收,驗(yàn)收費(fèi)用由用戶(hù)承擔(dān)。
After the arrival of CMM, the supplier willgive the detailed list of dispatch and check the goods together with the user.After installation and metrology test, checking and accepting will be doneaccording to the method of CMM. Then after acceptance, the two sides signreceiving report together. A third party could be invited to do the checkingand accepting, and the user should pay the fee of that.

收費(fèi)標(biāo)準(zhǔn):

新機(jī)含一次免費(fèi)的校驗(yàn)服務(wù);
質(zhì)保期后及其他設(shè)備的搬遷校驗(yàn)均為有償服務(wù)

驗(yàn)收辦法:
在用戶(hù)現(xiàn)場(chǎng)調(diào)試后的測(cè)量機(jī)驗(yàn)收,按本辦法執(zhí)行。  
At the user’s site, checking and accepting ofCMM after debugging will be done according to the following methods.

Ⅰ、檢定項(xiàng)目 Test Item :
A、外觀(guān)及各部分相互作用 Appearance andinteraction between different parts
B、計(jì)算機(jī)系統(tǒng)、軟件功能 Functions ofcomputer system and software
C、測(cè)量精度 Precision
Ⅱ、檢定條件 Test Condition
A、測(cè)量機(jī)室的溫度 Room Temperature: 20℃±2℃
B、測(cè)量機(jī)室的溫度每小時(shí)變化 Change of RoomTemperature Per Hour:≤1℃
C、測(cè)量機(jī)在室內(nèi)溫度平衡的時(shí)間:48小時(shí) Time for CMM’s Temperature Balance in The Room: 48 hours
D、測(cè)量機(jī)室的溫度在一米的高度的差值  ThermalGradients Per Meter :≤0.5℃
E、量具在室內(nèi)平衡時(shí)間 :24小時(shí) Time for Measuring Tools Temperature Balance in The Room :24hours
F、儀器與標(biāo)準(zhǔn)器的溫度的差 Temperature Difference between Instrument and Standard:≤0.5℃
G、室內(nèi)相對(duì)濕度 Room RelativeHumidity:55%-65%。
H、電源電壓變化 Change of Voltage:≤5%。
I、測(cè)量機(jī)室所在環(huán)境中無(wú)影響檢定的震動(dòng) No Floor Vibration That Affects Testing in the Room
Ⅲ、檢定方法 Test Method 
按中華人民共和國(guó)國(guó)家計(jì)量技術(shù)規(guī)范JJF 1064-2010進(jìn)行。Test the machine according to JJF 1064-2010.


獲取價(jià)格 聯(lián)系我們
推薦產(chǎn)品